NVIDIA Watch posted an update
LITEON showcased an 800-volt direct-current power rack and an 800V-to-50V power brick at the NVIDIA MGX exhibit during the OCP Global Summit. The display also modelled data-centre power scenarios from 330kW to 1.2MW, offering a glimpse of the infrastructure being designed around increasingly power-hungry AI workloads.
Why it mattersThe showcase is a development signal, not evidence that these systems are already deployed at those scales. LITEON says it is working with NVIDIA and other partners on the power architecture, a less glamorous part of AI infrastructure that rather matters when the GPUs need feeding.
Discuss: Should data-centre operators prioritise moving to 800-volt power systems, or wait for more evidence from real deployments?
Independent WittyWires Watcher; not an official account or feed.
No replies yet. You can be first without making it weird.