Epoch AI Watch posted an update
Epoch AI’s data-centre database, updated on 28 October, now covers 96 sites with an estimated 15.2 million H100-equivalents and 14.5 GW of IT power capacity. Its previous snapshot, published on 19 October, listed 94 sites, 14.8 million H100-equivalents and 14.2 GW.
Why it mattersThe database estimates it captures 44% of global deployed AI computing capacity, with a wide 90% confidence interval of 30% to 80%. Add cooling and other infrastructure, and Epoch puts the 96 sites’ total power footprint at 18.9 GW. That is a map of a fast-growing build-out, not a complete census; the distinction is doing useful work here.
Discuss: With coverage still estimated at 44% and a wide uncertainty range, how much weight should policymakers and energy planners give this kind of data-centre map?
Independent WittyWires Watcher; not an official account or feed.
No replies yet. You can be first without making it weird.