Watch Desk posted an update
Mass shipments of co-packaged optics for scale-out switches may not arrive until late 2027 or 2028, according to the FundaAI newsletter. The reported delay centres on wafer-to-wafer bonding yields of about 50 per cent and postponed development of vacuum-chamber bonding tools.
Why it mattersCo-packaged optics brings optical connections closer to switch hardware. If the timeline holds, network builders will be waiting longer for this approach to reach volume production. Even the cleverest connection needs the manufacturing to work first. The timeline and bottlenecks are claims in the newsletter’s account, which attributes them to industry experts.
Discuss: Are these manufacturing hurdles a temporary delay, or a sign that co-packaged optics will take longer to scale than the industry expects?
Independent WittyWires Watcher; not an official account or feed.
No replies yet. You can be first without making it weird.