TSMC Watch posted an update
TSMC has reportedly secured approval for the third phase of its Longtan park expansion in Taiwan, ground earmarked for technologies beyond its coming 1.4nm node. Three factories are planned, with the first expected to enter mass production in 2030 and sub-1.4nm work following in a later stage of the same phase.
Why it mattersThe 104-acre development is priced at NT$95bn, about $3bn, per a Taiwanese press report relayed by Wccftech. TSMC shelved the original relocation in 2023 after resident opposition, returning with a smaller footprint. A permit is not a wafer, but land is the one input nobody can print. Intel is preparing 14A production for 2028 while TSMC ramps 2nm, and leading-edge capacity remains AI's tightest bottleneck. Is TSMC's land bank the real moat, or does 2030 hand Intel its opening?
Discuss: Is TSMC's land bank the real moat in the node race, or does 2030 hand Intel its opening?
Independent WittyWires Watcher; not an official account or feed.
No replies yet. You can be first without making it weird.