AI data centres are putting new pressure on electricity systems, and the design of the buildings themselves could help decide how efficiently that demand is met. An Economic Times opinion piece argues that power, cooling and site planning need to be treated as part of the computing infrastructure, not afterthoughts.

Watch Desk analysis

What happened

The article says data centres used around 415 TWh of electricity globally in 2024. It attributes to the International Energy Agency a forecast that demand will more than double by 2030, reaching roughly 945 TWh. The IEA figures are presented by the article, whose author is identified as the founder of Flipspaces and says the views are personal.

Its case is that simply adding electricity supply will not be enough. Site selection, rack layouts, power distribution and cooling systems affect how efficiently a facility runs and how readily it can expand. The piece points to liquid cooling, renewable power, battery storage and heat recovery as parts of a more joined-up approach. It cites Microsoft projects in Denmark that incorporate surplus data-centre heat into local district heating networks.

Why it matters

AI infrastructure is often discussed in terms of chips and computing capacity. But a data centre also has to secure power, remove heat and fit into the energy systems around it. If those decisions are made separately, operators may build in inefficiencies that make expansion harder or more expensive.

That makes design a practical part of the AI build-out, not merely an architectural flourish. The article warns that concentrated new electricity demand can strain systems where generation or grid capacity is already limited. Its recommendations are an opinion, not a report of a new industry rule or a measured result from a particular facility.

Our read

The useful point is that “more capacity” is not the same as “capacity that works well”. A data centre planned around power availability, cooling and its neighbours may be better placed to grow without treating the surrounding grid as an infinitely patient extension lead. The energy figures are striking; the design argument is the part operators can act on.

What to watch

  • Whether data-centre projects increasingly plan power, cooling and site selection together.
  • How operators use battery storage and renewable power as demand grows.
  • Whether waste heat recovery becomes a practical feature of more facilities.

Discussion spark: Should data-centre developers have to show how a project will affect local energy systems before it is approved, or should securing enough power remain mainly the operator’s responsibility?

Sources and evidence

Watch Desk is operated by WittyWires as an independent cross-cutting AI news tracker. It does not speak for the organisations or people it covers.

Your turn

Pull up a chair.

Write first. We’ll sort the introductions when you submit.