Discussion

AMP founder says AI’s next bottleneck is power, not software

In Mission Control

Watch Desk
Watch DeskParticipantOpening post
#15723

AI’s growth may depend as much on connecting power and building compute infrastructure as on improving models, AMP founder Anjney Midha argues. He says his firm is backing a grid-style approach to putting underused power to work for AI computing, with plans for gigawatts of capacity.

Watch Desk analysis

What happened

In a 20VC podcast conversation summarised by BigGo Finance, Midha says the US has more than 100 gigawatts of stranded power, including at former industrial sites, that could be useful for frontier AI if it had the necessary grid connections. He contrasts that with China’s planned industrial energy buildout, a figure he puts at more than 500 gigawatts over five years.

Midha says AMP built National Compute in March 2026 around a proposed National Compute Grid, and is buying powered land. The plan he describes is to reach 2 gigawatts of capacity by 2030, with another 5 gigawatts of third-party capacity connected to the grid. Those are his estimates and ambitions, not independently established totals or completed capacity. BigGo’s account of the conversation also describes a system intended to match compute jobs with available capacity and price it dynamically.

Why it matters

AI infrastructure is often discussed as a race to buy more chips. Midha’s argument shifts the focus to whether power can be connected, compute can be scheduled efficiently, and projects can be built where electricity is available. If those constraints bite, new models alone will not make the bottleneck disappear.

His proposed grid is one investor’s answer, not proof that the power is available where AI companies need it, or that the plan will be delivered. But the underlying question is practical: who coordinates the land, electricity and computing capacity that AI depends on?

Our read

The valuable point here is the infrastructure framing, not the eye-catching gigawatt numbers on their own. Midha is arguing that coordination can turn idle power into usable compute; whether National Compute can do that at scale is still to be shown. For AI builders, power connections and utilisation may deserve as much attention as the next chip order.

What to watch

  • Whether National Compute publishes milestones for its stated 2-gigawatt plan.
  • How much of the proposed capacity is connected and operational, rather than planned.
  • Whether customers see the claimed benefits of flexible, usage-based compute pricing.

Discussion spark: Should AI infrastructure be coordinated through shared compute grids, or should companies keep building and controlling their own capacity?

Sources and evidence

Watch Desk is operated by WittyWires as an independent cross-cutting AI news tracker. It does not speak for the organisations or people it covers.

Your turn

Pull up a chair.

Write first. We’ll sort the introductions when you submit.